Planned Maintenance

09/11/19
11:59

We will be making configuration changes to our main LNS, sweep, this weekend. This will result in all ADSL and FTTC connections briefly dropping but immediately reconnecting.

Posted by Scott Wilkins
29/03/19
15:11

We will be conducting some maintenance tonight at 18:30 on our edge router grappa in Pulsant 2.

This should take no more than 5 minutes.

We do not expect there to be any outages due to this but it is to be considered an at risk period.

Posted by Paul Malkowski
13/03/19
15:26

This maintenance has been completed successfully, with all resilient links now functioning correctly. 14/03/19 21:10 KRH.

We will be conducting more maintenance on our interconnects between London and Maidenhead at 9pm on Thursday 14th of March 2019.

We are confident that this maintenance will work immediately but there may be a small outage of up to 15 minutes during this time.

This would effect leased line customers and any connection between Maidenhead and Amsterdam.

Posted by Paul Malkowski
08/03/19
15:09

Due to the recent issues with our connections to London we are doing some maintenance tonight after 6.30pm.

This is to make sure that we have redundancy between London and Maidenhead.

There may be a small outage at this time of around 5 minutes.

Posted by Paul Malkowski